System Analysis and Design (SAD) MCQs

System Analysis and Design (SAD) Full Question Bank

Tap an option, see immediate feedback, retry the wrong ones, and review the final correct answers at the end.

Questions

60

Answered

0

Score

0%

Continue answering

Q1 · Information Systems

Decision Support System (DSS) are essential for

Not answered

Q2 · Data Model

A data model is a:

Not answered

Q3 · SDLC

Actual programming of software code is done during the ______ step in the SDLC.

Not answered

Q4 · CASE Tools

A CASE tool is classified as a:

Not answered

Q5 · Software Models

Which of the following is not associated with the prototyping model?

Not answered

Q6 · Software Models

Which model is used to analyze the risk factor for developing software?

Not answered

Q7 · Project Management

Potential development projects can be identified by:

Not answered

Q8 · Process Framework

Which of the following activities of the generic process framework delivers a feedback report?

Not answered

Q9 · Software Models

The Agile Software Development model is built based on:

Not answered

Q10 · Cost Analysis

A cost associated with an information system that cannot be easily measured in terms of dollars or with certainty refers to:

Not answered

Q11 · SDLC

Which of the following is the first step of SDLC?

Not answered

Q12 · Documentation

Documentation is prepared:

Not answered

Q13 · Database Systems

Which of the following is not an advantage of Database Systems?

Not answered

Q14 · System Analysis and Design

What is the major goal of System Analysis & Design?

Not answered

Q15 · File Organization

Sequential organization:

Not answered

Q16 · BPP Report

Which of the following is not included in BPP report?

Not answered

Q18 · System Analyst

The impertinence characteristic of a good system analyst is represented by which of the following statements?

Not answered

Q19 · Feasibility Analysis

What is the key consideration involved in feasibility analysis?

Not answered

Q20 · Information Systems

Which of the following Information Systems are aimed at improving the routine business activities on which all organizations depend?

Not answered

Q21 · Project Life Cycle

The project life cycle does not consist of

Not answered

Q22 · Software Models

Which is the most important feature of the Spiral Model?

Not answered

Q23 · CASE Tools

Which of following are CASE tools?

Not answered

Q24 · Requirements

Identify the correct functional requirement:

Not answered

Q25 · Feasibility Analysis

What determines if the project should go forward?

Not answered

Q26 · Documentation

_____ includes the existing system, the proposed system, system flowcharts, modular design of the system, print layout charts, and data file designs.

Not answered

Q27 · SDLC

For the best software model suitable for the project, in which phase do developers decide a roadmap for the project plan?

Not answered

Q28 · ER Diagram

What does double oval denote while constructing ER diagram?

Not answered

Q29 · Software Design

The importance of software design can be summarized in a single word, which is:

Not answered

Q30 · Software Design

Cohesion is a qualitative indication of the degree to which a module:

Not answered

Q31 · Algorithms

A programmer reviews the accuracy of an algorithm by _____ it.

Not answered

Q32 · Normalization

Which is true for 2NF from following?

Not answered

Q33 · Testing

Testing beyond normal operational capacity is called

Not answered

Q34 · Design

The primary deliverable from design phase is termed as

Not answered

Q35 · Software Economics

Reduced personnel expenses, lower transaction costs or higher profit margin

Not answered

Q36 · Software Models

Which is the most important feature of the spiral model?

Not answered

Q37 · Implementation

Using the ______ approach, a new system is tested in one part of the organization before being implemented in others.

Not answered

Q38 · Maintenance

_____ extends the software beyond its original functional requirements.

Not answered

Q39 · PERT

If the optimistic time is 15 days, pessimistic time is 25 days and the realistic time is 16 days the expected completion time would be

Not answered

Q40 · Decision Making

_____ is a tabular method for describing the logic of the decision to be taken.

Not answered

Q41 · Normalization

Which normal form looks at removing partial dependencies?

Not answered

Q42 · ER Diagram

In constructing ER diagrams, double ovals are used to denote

Not answered

Q43 · Testing

Testing beyond normal operational capacity is called

Not answered

Q44 · Implementation

Which approach is used while a new system is tested in one part of the organization before being implemented in others?

Not answered

Q45 · Software Estimation

Which of the following is not considered an option for achieving reliable cost and effort estimates?

Not answered

Q46 · ER Model

An E-R model with attributes is prepared during:

Not answered

Q47 · ER Diagram

_____ is used to represent in ER Diagram

Not answered

Q48 · Information Systems

Which of the following information systems are aimed at improving the routine business activities on which all organizations depend?

Not answered

Q49 · Data Flow Diagram

Which of the following is a true statement regarding data flows?

Not answered

Q50 · Normalization

A relation that has no partial dependencies is in

Not answered

Q51 · Software Maintenance

Changes are made to repair defects in the design, coding or implementation of the system

Not answered

Q52 · Software Economics

Which among the following is the example of cost reduction and avoidance, error reduction and increased speed of activity?

Not answered

Q53 · Information Systems

Which of the following information system are aimed at improving the routing business activities on which all organization depends?

Not answered

Q54 · Feasibility Analysis

Feasibility study is conducted during

Not answered

Q55 · SDLC

Which is the first step in the software development?

Not answered

Q56 · Modeling

A ______ is a graphical tool for identifying the flow of data through a system.

Not answered

Q57 · Software Models

Which of the following models don't necessitate defining requirements at the earliest in the life cycle?

Not answered

Q58 · Design

_____ refers to the division of a system into processes or subsystems.

Not answered

Q59 · Software Design

In structured programming, a program is decomposed into modules. Coupling and cohesion describe the decomposition should attempt to:

Not answered

Q60 · Testing

Acceptance testing is:

Not answered